JW Marriott · Dubai, UAE · 2024 · 1 min read
JW Marriott Dubai
Rapid implementation of operational optimisation delivered a measurable reduction within two weeks of start-up.
The assignment
JW Marriott wanted quick impact on energy consumption without waiting for large investment projects. SustEvo carried out a focused analysis of ventilation, cooling and controls, and prioritized measures that could be implemented immediately.
Results
Within two weeks of project start, several measures were operational and produced measurable reductions on the main meters. Guest experience remained unchanged, while energy consumption is lower and peak load was reduced during the warmest period.
2 weeksFrom start to measurable savingsFocused operational optimization without major investments.Services used