JW Marriott Dubai

JW Marriott · Dubai, UAE · 2024 · 1 min read

JW Marriott Dubai

Rapid operational optimisation delivered measurable reductions within two weeks of start-up.

The assignment

JW Marriott wanted an immediate impact on energy use without waiting for major investment projects. SustEvo carried out a focused review of ventilation, cooling, and controls, and prioritised measures that could be put in place straight away.

The result

Within two weeks of project start, several measures were in operation and delivered measurable reductions on the main meters. The guest experience remained unchanged, while energy consumption is lower and peak load has been reduced during the warmest period.

2 ukerFrom start-up to verified savingsTargeted operational optimisation with no major investments.

Services used