JW Marriott Dubai

JW Marriott · Dubai, UAE · 2024 · 1 min read

JW Marriott Dubai

Rapid implementation of operational optimisation delivered a measurable reduction within two weeks of start-up.

The assignment

JW Marriott wanted quick impact on energy consumption without waiting for large investment projects. SustEvo carried out a focused analysis of ventilation, cooling and controls, and prioritized measures that could be implemented immediately.

Results

Within two weeks of project start, several measures were operational and produced measurable reductions on the main meters. Guest experience remained unchanged, while energy consumption is lower and peak load was reduced during the warmest period.

2 weeksFrom start to measurable savingsFocused operational optimization without major investments.