JW Marriott · Dubai, UAE · 2024 · 1 min read
JW Marriott Dubai
Rapid implementation of operational optimisation achieved measurable reductions within two weeks of start-up.
The assignment
JW Marriott wanted a rapid impact on energy use without waiting for major investment projects. SustEvo performed a targeted analysis of ventilation, cooling and controls, and prioritised measures that could be implemented immediately.
The result
Within two weeks of project start, several measures were in operation and produced measurable reductions on the main meters. Guest experience has remained unchanged, while energy consumption is lower and peak load has been reduced during the warmest period.
2 ukerFrom start-up to measurable savingsTargeted operational optimisation without major investments.Services used